Our Process

From first sketch to final walkthrough.

Every Merideth Cole Architecture project moves through five clear phases. You always know which phase you are in, what you will receive at the end of it, and what it costs - no black boxes, no open-ended billing.

The Five Phases

A design process built in five clear phases.

Each phase ends with something you can see and approve before the next one starts - so the project moves forward on your terms, not ours.

Phase 1

Consultation & Programming

We start by understanding the site, your budget, and how you actually intend to live in or use the space. This programming phase turns a wish list into a defined scope - square footage, room relationships, must-haves, and the realistic budget range the design has to hit.

You receive: Project brief, space program, preliminary budget range, site assessmentWho is involved: You, Merideth, and - on larger projects - a project architectTypical timeline: 2 – 4 weeks
Phase 2

Schematic Design

We translate the program into form - floor plans, massing studies, and early exterior concepts. You will see two or three directions, and we refine toward one. This is where the big moves get decided: orientation for passive solar, where the light comes from, how spaces flow.

You receive: Schematic floor plans, massing and exterior concepts, refined budget checkWho is involved: Merideth leads design; you review and give direction at each roundTypical timeline: 4 – 8 weeks
Phase 3

Design Development

The chosen scheme gets resolved. Wall assemblies, window and door selections, structural approach, and interior architecture - built-ins, millwork, materials - are all locked in. We coordinate early with structural and MEP engineers so nothing surprises us later.

You receive: Developed plans and elevations, material and fixture selections, engineer coordinationWho is involved: Merideth, project architect, and consulting engineersTypical timeline: 6 – 10 weeks
Phase 4

Construction Documents & Permitting

We produce the complete, code-compliant drawing set a contractor builds from and the City of Austin reviews. Then we submit for permit and manage the back-and-forth - plan-review comments, revisions, and resubmittals - through approval, so you never have to navigate the permit desk yourself.

You receive: Stamped construction document set, permit application, plan-review responsesWho is involved: Merideth (licensed to stamp drawings) plus the City of Austin reviewersTypical timeline: 6 – 12 weeks, including city review
Phase 5

Construction Administration

During construction we stay involved - reviewing contractor submittals and shop drawings, answering field questions, making site visits at key milestones, and confirming the work matches the drawings. The goal is simple: the building that gets built is the building we designed.

You receive: Site-visit reports, submittal and RFI review, punch-list walkthroughWho is involved: Merideth and your general contractor, coordinated throughout the buildTypical timeline: Runs the length of construction

What you receive along the way

  • A defined scope and program before any drawing begins
  • Schematic plans and concepts you review and steer at every round
  • Fully developed plans, elevations, and material selections
  • A stamped, code-compliant construction document set
  • Permit submittal and plan-review management with the City of Austin
  • On-site construction administration through the punch list

How fees & permits work in Austin

  • Fees are typically a percentage of construction cost or a fixed fee, set once the scope is defined in Phase 1
  • You approve the scope and fee before design work starts - no open-ended billing
  • Structural and MEP engineering are coordinated in-house and quoted up front
  • City of Austin permit and plan-review fees are paid to the jurisdiction and are separate from design fees
  • A budget check at the end of Schematic Design confirms the design still fits before we invest in detailing
  • Historic-district or floodplain sites in Austin can add review steps - we flag those early so there are no surprises
Start With Phase 1: Book a Consultation →

No commitment past the phase you approve. Or call (512) 555-0173 and we will walk you through what your project needs.

Questions

Process, Timelines & Fees

What are the phases of an architecture project?

Most projects move through five phases: consultation and programming (defining scope, site, and budget), schematic design (early plans and concepts), design development (resolving materials, structure, and details), construction documents and permitting (the stamped set the city reviews and the contractor builds from), and construction administration (staying involved during the build). Every Merideth Cole Architecture project follows this sequence, scaled to the size of the work.

How long does the whole process take?

A home addition or renovation typically runs 3 – 5 months for design and construction documents, plus construction time. A full custom home usually runs 6 – 9 months through design, permitting, and documents before ground is even broken. Timelines shift with scope, how quickly decisions get made, and the City of Austin's review queue - we give you a realistic schedule at the first consultation.

How do architecture fees work?

Fees are set once the scope is defined in Phase 1 - usually as a percentage of construction cost or a fixed fee - and you approve them before design work begins, so there is no open-ended billing. Structural and MEP engineering is coordinated in-house and quoted up front. City of Austin permit and plan-review fees are paid to the jurisdiction and are separate from our design fee.

Do you handle permitting with the City of Austin?

Yes. Because Merideth is a licensed Texas architect, she can stamp the construction documents the city requires. We prepare the permit submittal, respond to plan-review comments, and manage revisions and resubmittals through approval - you do not have to deal with the permit desk yourself. On historic-district, floodplain, or variance sites we flag the extra review steps at the start.

Can I stop after schematic design, or do I have to commit to the whole process?

You can. The phases are contracted so you have a natural decision point at the end of each one. Many clients complete Schematic Design first to lock in the direction and confirm the budget, then decide whether to continue into Design Development and construction documents. You are never committing to the full scope before you have seen where the design is going.

Do you stay involved during construction?

Yes - that is the Construction Administration phase. We review contractor submittals and shop drawings, answer field questions, visit the site at key milestones, and walk the punch list at the end. Staying engaged through the build is how we make sure the finished project actually matches the drawings, rather than drifting during construction.

Ready to start the process?

Schedule a consultation and we will walk you through Phase 1 - the site, your budget, and exactly what your project will take.